Swet Ganga Hydropower & Construction (P.) Ltd is a special purpose vehicle for implementing Lower Likhu Hydropower Project (28.1 MW).
Lower Likhu Hydropower Project (LLHP) is a run-of-river (RoR) hydropower project with an installed capacity of 28.1 MW. The entire project area (headworks to power house) is located at Sirise, Saipu and Bijulikot VDCs of Ramechhap District, Central Development Region of Nepal.
Geographically, the project lies between 86Ëš 14’ 58” E to 86Ëš 13’ 17” E and 27Ëš 25’ 50” N to 27Ëš 22’ 47” N. The project’s headworks is located at the right bank of Likhu Khola, Sirise Village of Sirise VDC at some 200m upstream from the confluence of Pokali and Likhu Khola. Whereas, power house is located at the right bank of Likhu khola, Ratamata. The latitude and longitude of powerhouse is 27Ëš 23’ 27” N and 86Ëš 13’ 44” E respectively.
The generated power of 28.1 MW will be evacuated through approximately 23 km of transmission line and will be connected to Integrated Nepal Power System (INPS) at Nepal Electricity Authority’s proposed New Khimti Substation at Devitar.